Laserfiche WebLink
• SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />REVEGETATION OF TIE-ACROSS HAUL ROADS <br />SUMMARY SHEET <br />Operation Acres CosVAc Total <br />1 Drill Seed Cover Crop <br />2 Drill Seed Mix 1 <br />3 Drill Seed Mix 2 <br />4 Drill Seed Mix 3 <br />5 Drill Seed Cropland <br />6 Straw Mulch <br />SUBTOTAL <br />112 $72.37 $8,105.44 <br />24.4 $634.03 $15,470.33 <br />1.9 $512.42 $973.60 <br />18.8 $313.35 $5,890.98 <br />66.9 $138.76 $9,283.04 <br />50 $275.00 $13,750.00 <br />$53,473.39 <br />Assume 20% Failure <br />TOTAL <br /> <br /> <br />$10,694.68 <br />$64,168 <br />25-1-14 <br />Revised OS/O1 <br />