Laserfiche WebLink
c <br />Stipulation No. 19 <br /> <br />-~- <br />c <br />WITHIN 60 DAYS OF PERMIT ISSUANCE THE PERMITTEE WILL INDICATE TO THE <br />DIVISION, IN WRITING, WHETHER THE STANDARDS FOR COVER AND PRODUCTION ON <br />THE GRASSLAND REFERENCE AREA ARE ACCEPTABLE, OR 'AHETHER THE PERMITTEE <br />WILL RESAMPLE AFFECTED AND REFERENCE AREAS FOR THE GRASSLAND COMMUNITY <br />TO IDENTIFY AN EQUIVALENT <br />RESAMPLE; A SAMPLING PLAN <br />ISSUANCE, TO BE SUBMITTED <br />NEXT GROWING SEASON. <br />Stipulation No. 20 <br />REFERENCE AREA. IF THE PERMITTEE ELECTS TO <br />SHALL BE REQUIRED WITHIN 60 DAYS OF PERMIT <br />AS A REVISION, TO BE IMPLEMENTED DURING THE <br />THE PERMITTEE IS REQUIRED T0: <br />A. SEED ALL REVEGETATION SEED MIXES BETWEEN AUGUST 15 AND NOVEMBER 15 <br />AND APRIL 1 AND MAY 15. THIS DOES NOT PRECLUDE PROTECTION OF REGRADED <br />AREAS BY USE OF A STRAW OR OTHER MULCH DURING THE INTERIM BETWEEN <br />GRADING, TOPSOILING, AND SEEDING. <br />B. THE REVEGETATION SEED MIX AS PROPOSED IN TABLE 16 (REVISED 11/82) <br />WILL BE DRILL SEEDED AT THE RATE PROPOSED ON ALL SLOPES LESS THAN <br />3h :l v. ALL OTHER AREAS WILL BE BROADCAST SEEDED AT A RATE TWO TIMES <br />THAT PROPOSED IN TABLE 16 (REVISED 11/82). <br />C. APPLY STRAW MULCH AT A RATE OF 4000 POUNDS/ACRE, AND CRIMPED IN <br />PLACE. THE DIVISION SPECIFICALLY DISAPPROVES THE USE OF ANY NURSERY <br />CROP OR STUBBLE MULCH AT THIS TIME. <br />D. USE NO IRRIGATION FOR ESTABLISHMENT OF REVEGETATED SPECIES ON <br />RECLAIMED LAND, WITH THE EXCEPTION OF THE CROPLAND AREA IMi•IEDIATELY <br />SOUTH OF THE PURGATOIRE RIVER. <br />E. USE NO PESTICIDES OR HERBICIDES ON REVEGETATED AREAS WITHOUT THE <br />EXPRESS WRITTEN APPROVAL OF THE DIVISION. <br />F. CONDUCT A SOIL TESTING PLAN, EVALUATING THE MAJOR SOIL NUTRIENTS OF <br />NITROGEN, PHOSPHORUS, AND POTASSIUM, PRIOR TO SEEDING. RESULTS WILL BE <br />FORWARDED TO THE DIVISION. AUGMENTED FERTILIZATION WILL BE CONDUCTED AS <br />REQUIRED BY THE DIVISION. <br />G. SUBMIT A DISCUSSION OF THE METHODS AND CRITERIA PURSUANT TO RULE <br />4.15.7 AND 4.15.8 BY WHICH REVEGETATION SUCCESS SHALL BE EVALUATED AT <br />THE MAXWELL MINE. THIS INFORMATION SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE. THIS DISCUSSION MUST BE APPROVED <br />IN WRITING BY THE DIVISION PRIOR TO RELEASE FROM THE REQUIREMENTS OF <br />THIS SECTION. <br />