Laserfiche WebLink
C f <br />-6- <br />Stipulation No. 15 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST INDICATE UN r4AP 3 <br />WHICH SOIL HORIZON IS STORED IN EACH STOCKPILE. THE PERMITTEE MUST <br />IDENTIFY EACH STOCKPILE WITH AN APPROPRIATE MARKER. <br />Stipulation No. 16 <br />WITHIN 12 MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE THE <br />DIVISION WITH A PLAN FOR THE REDISTRIBUTION OF TOPSOIL AT THE MAXWELL <br />MINE. THIS PLAN MUST INDICATE, WITH REASONABLE SPECIFICITY, THOSE AREAS <br />WHICH WILL RECEIVE TOPSOIL DURING REDISTRIBUTION AND THE RELATIVE DEPTHS <br />OF TOPSOIL AND SUBSOIL WHICH WILL BE REPLACED ON THESE AREAS. THE <br />TOPSOIL MATERIAL MUST BE REPLACED WHEN IT IS IN A RELATIVELY DRY <br />CONDITION. THIS PLAN WILL BE SUBMITTED AS A REVISION TO THE PERt4IT. <br />Stipulation No. 17 / <br />WITHIN 12 MUIJTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST PROVIDE A PLAN <br />TO THE DIVISION FOR THE RECLAMATION OF ALL DISTURBED SURFACE LANDS WHICH <br />'WILL NOT BE RETOPSOILED DURING RECLAMATION. THIS PLAN MUST INCLUDE <br />ANALYSES OF AN APPROPRIATE NUMBER OF SAMPLES OF THE DISTURBED MATERIAL <br />TO DEMONSTRATE SUITABILITY OF 7HE MATERIAL TO A DEPTH OF 40 INCHES ON <br />THE BASIS OF TEXTURE, pH, ELECTRICAL CONDUCTIVITY, SAR, SATURATION <br />• PERCENTAGE, PERCENT ORGANIC MATTER, SELENIUM, AND BORON. THE PLAN MUST <br />ALSO INCLUDE APPROPRIATE MEASURES WHICH WILL BE EMPLOYED DURING <br />PREPARATION OF THE DISTURBED SURFACE PRIOR TO SEEDING (i.e., REDUCTION <br />OF COMPACTION). <br />IF THE ANALYSES OF THE IN-PLACE MATERIAL INDICATE THAT SUCCESSFUL <br />REVEGETATION CANNOT BE ATTAINED, THE PERMITTEE MUST PROPOSE A PLAN TO <br />APPLY APPROPRIATE PMENDMENTS TO r1AKE IT SUITABLE OR IMPORT SUITABLE <br />MATERIAL. IF AMENDMENTS OTHER THAN NITROGEN, PHOSPHORUS, POTASSIUM, <br />SULFUR, OR IRON ARE REQUIRED, THE PERrITTEE MUST SUBMIT THE RESULTS OF <br />APPROPRIATE TESTS TO PROVE THE AMENDMENT MATERIAL IS SUITABLE FOR <br />REVEGETATION. THIS PLAN WILL BE SUBMITTED AS A REVISION TO THE PERr4IT. <br />Stipulation No. 18 <br />THE PERMITTEE SHALL SUBMIT TO THE DIVISION A TABLE OF THE ACTUAL AND <br />PROPOSED ACREAGES OF DISTURBANCE FOR EACH VEGETATION TYPE AT THE MAXWELL <br />MINE WITHIN 30 DAYS OF PERrgIT ISSUANCE. IF THE PINYON-JUfJIPER <br />VEGETATION COMMUNITY COr4PRISES 5 PERCENT OR LESS OF THE AFFECTED <br />ACREAGE, NO SAf+IPLING WILL BE REQUIRED. IF SAMPLING IS REQUIRED, A PLAN <br />MUST BE SUBMITTED TO THE DIVISION AS A REVISION TO THE PERMIT. <br />