Laserfiche WebLink
C C <br />-2- <br />• Stipulation No. S <br />THE PERMITTEE SHALL VERIFY THE LOCATIONS OF ALL SPRINGS AND <br />SEEPS IDENTIFIED IN THE PRELIMINARY SPRING SURVEY THROUGH A <br />FIELD SURVEY. THIS FIELD SPRING SURVEY SHALL INCLUDE A <br />DESCRIPTION OF EACH SPRING OR SEEP KEYED TO A LOCATION MAP. THE <br />DESCRIPTION SHALL CONTAIN THE POTENTIAL OR OBSERVED SOURCE OF <br />EACH SPRING OR SEEP (i.e., SANDSTONE OUTCROP, ALLUVIUM, FAULT <br />ZONE, FRACTURE ZONE, ETC.); THE MEASURED OR ESTIMATED FLOW RATE <br />OF EACH SPRING OR SEEP; AND THE FIELD MEASUREMENT OF pH, <br />ELECTRO-CONDUCTIVITY, AND TEMPERATURE fOR EACH SPRING OR SEEP. <br />THIS SPRING SURVEY SHALL BE CONDUCTED IN MARCH OR APRIL OF 1984, <br />WHEN WEATHER PERMITS ACCESS TO THESE AREAS. RESULTS OF THE <br />FIELD SPRING SURVEY SHALL BE SUBMITTED TO THE DIVISION BY JUNE <br />1, 1984. <br />Stipulation No. 6 / <br />THE PERMITTEE SHALL MONITOR THE FLOWS OF ALL SPRINGS AND SEEPS <br />WITHIN THE MAXWELL MINE'S PERMIT AND ADJACENT AREAS ON A MONTHLY <br />BASIS FOR ONE GROWING SEASON (APRIL THROUGH OCTOBER). THE <br />PERMITTEE MAY REQUEST A REDUCTION IN SPRING ANO SEEP MONITORING <br />FOLLOWING THE SUBMITTAL OF THE DATA OBTAINED DURING THE GROWING <br />SEASON, AND SUBMITTAL OF AN ASSESSMENT OF THE SIGNIFICANCE OF <br />• THE SPRINGS AND SEEPS TO SURFACE FLOWS, IRRIGATION PRACTICES, <br />LIVESTOCK WATERING, WILDLIFE WATERING, AND DOMESTIC USE. <br />Stipulation No. 1 '' <br />WITHIN 90 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL PROVIDE A <br />MAP SHOWING THE LOCATION OF ALL WELLS WITHIN ONE MILE OF THE <br />PER(+IIT AREA. IN ADDITION, THE PERMITTEE SHALL ASSESS THE <br />PROBABLE HYDROLOGIC CONSEQUENCES OF MINING ON THOSE WELLS. <br />Stipulation No. 8 'i <br />PRIOR TO SECONDARY OR RETREAT MINING AT THE MAXWELL MINE, THE PERr4ITTtE <br />SHALL PROVIDE A HYDROLOGIC SURVEY IDENTIFYING ALL ALLUVIAL AQUIFERS IN, <br />OR ADJACENT TO THE PERMIT AREA (EXCEPT FOR THE PUkGATUIRE RIVER ALLUVIAL <br />AQUIFER WHICH HAS ALREADY BEEN IDENTIFIED). THIS SURVEY SHALL CONTAIN <br />INFORIM,TION CONCERNING DEPTH BELOW THE SURFACE, HORIZONTAL EXTENT, WATER <br />USE, AND QUANTITY AND QUALITY OF GROUND WATER AS REQUIRED UNDER RULE <br />2.04.1(1). THE PERMITTEE SHALL ALSO PROVIDE A DISCUSSION OF THE <br />PROBABLE HYDROLOGIC CONSEQUENCES OF MINING UPON THOSE ALLUVIAL AQUIFERS <br />IDENTIFIED. <br /> <br />