Laserfiche WebLink
~ c <br />Attachment A <br />Stipulation No. 1 <br />THE PERMITTEE MUST RECLAIM THE AREAS OF SEDIMENT POND #3, THE <br />WATER INTAKE POND, AND THE PUMP STATION TO CROPLAND CONSISTENT <br />WITH THE IMMEDIATELY SURROUNDING AREA, EXCLUDING THE ACTIVE <br />STREAM CHANNEL. A SEED MIX REFLECTING SPECIES CURRENTLY IN USE <br />IN THE IRRIGATED HAYLAND MUST BE SUBMITTED FOR DIVISION APPROVAL <br />WITHIN 60 DAYS OF PERMIT ISSUANCE. THE INFORMATION IS TO BE <br />SUBMITTED AS A REVISION TO THE PERMIT. <br />IN ADDITION, PRODUCTIVITY FIGURES IN POUNDS PER ACRE FROM THE <br />IMMEDIATELY ADJACENT IRRIGATED HAYLAND AREA MUST BE SUBMITTED TO <br />THE DIVISION EVERY YEAR FOR THE FIVE YEPRS OF THE PERMIT TERM. <br />THIS FIVE YEAR PRODUCTIVITY DATA BASE WILL BE USED IN SETTING <br />REVEGETATION GOALS FOR CROPLAND. THE FIRST DATA IS DUE DECEMBER <br />31, 1984. SUBSEQUENT DATA WILL BE DUE AT THE END OF EACH <br />CALENDAR YEAR. <br />Stipulation No. 2 ,; <br />WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST SUBMIT A <br />STATEMENT CERTIFIED BY A REGISTERED PROFESSIONAL ENGINEER <br />ATTESTING THAT THE TWO SEDIMENT PONDS HAVE BEEN CONSTRUCTED AS <br />DESIGNED. <br />Stipulation No. 3 <br />THE PERMITTEE MUST DEVELOP ANO SUBMIT A SURFACE WATER BUDGET <br />THAT ADDRESSES THE AMOUNT OF WATER REMOVED FROM THE PURGATOIRE <br />RIVER, THE AMOUNT OF WATER THAT IS CONSUMPTIVELY USED DURING <br />MINING, AND THE AMOUNT THAT IS DISCHARGED TO THE RIVER. THIS <br />INFORMATION MUST BE SUBMITTED TO 7HE DIVISION WITHIN 30 DAYS OF <br />PERMIT ISSUANCE AND IS TO BE INCLUDED AS PART OF THE PROBABLE <br />HYDROLOGIC CONSEQUENCES DISCUSSION. <br />Stipulation No. 4 <br />THE PERMITTEE SHALL COi~DUCT A PRELIMINARY SPRING AND SEEP SURVEY <br />USING AERIAL PHOTOGRAPHY OF THE PERMIT AND ADJACENT AREAS. THE <br />PRELIMINARY SPRING SURVEY SHALL CONSIST OF A IdAP OF THE PERMIT <br />AND ADJACENT AREAS WHICH WILL SHOW THE LOCATION OF ALL POTENTIAL <br />SPRING AND SEEPS IDENTIFIED ON THE AERIAL PHOTOGRAPHS. THE <br />PRELIMINARY SPRING SURVEY SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN 30 DAYS OF THE PERMIT ISSUANCE AND BEFORE THE <br />COMMENCEMENT OF MINING IN THE MAXWELL MINE. <br />• <br />