Laserfiche WebLink
• - 2 <br />Stipulation-6~ <br />3S WITHIN 60 DAYS FOLLOWING COMPLETION OF 7HE CONSTRUCTION OF THE DRAINAGE <br />DITCHES APPROVED AS PART OF TECHNICAL REVISION 04, WYOMING FUEL COMPANY WILL <br />PROVIDE THE DIVISION WITH A POST-CONSTRUCTION MAP OF THE LOCATION OF THE <br />DITCHES AND OF THEIR BEDROCK AND RIP-RAPPED SECTIONS TOGETHER WITH <br />REPRESENTATIVE CROSS-SECTIONS, RIP-RAP SIZING, AND AS-BUILT ENGINEERING <br />CERTIFICATIONS, CALCULATIONS ACCEPTABLE TO THE DIVISION SHALL ALSO BE <br />PROVIDED TO DEMONSTRATE THAT ALL SECTIONS OF THE CHANNELS CAN SAFELY PASS THE <br />RUNOFF FROM A 100 YEAR 24 HOUR PRECIPITATION EVENT. <br />srs <br />1505E <br /> <br />