My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109963
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:55 PM
Creation date
11/24/2007 7:14:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 28 STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There are six (6) Stipulations to the Division's approval of Technical <br />• Revision No. 04, Expansion of Ciruela Canyon Waste Pile, Golden Eagle Mine <br />(Permit No. C-87-013). <br />Stipulation 1 <br />he PRIOR TO INITIATING CONSTRUCTION OF ANY ASPECT OF THE APPROVED TECHNICAL <br />REVISION 04, WYOMING FUEL COMPANY SHALL PROVIDE ADDITIONAL RECLAMATION BONDING <br />IN THE SUM OF 523,772.72 IN A FORM ACCEPTABLE TO THE DIVISION. <br />Stipulation 2 <br />3i PRIOR TO INITIATING CONSTRUCTION OF ANY ASPECT OF THE APPROVED TECHNICAL <br />REVISION 04, WYOMING FUEL COMPANY SHALL COMMIT IN WRITING TO RECLAMATION OF <br />THE EXPANDED WASTE PILE USING 4 FEET OF NON-TOXIC COVER MATERIAL WHOSE <br />CHARACTERISTICS ARE ACCEPTABLE TO THE DIVISION. <br />Stipulation 3 <br />3Z PRIOR TO STOCKPILING OR USE OF ANY TOPSOIL OR SUBSOIL FROM AREAS 1 OR 4 AS <br />IDENTIFIED ON FIGURE 1, THE MAP OF THE PROPOSED COAL PROCESSING WASTE PILE, <br />WYOMING FUEL COMPANY SHALL DETERMINE THE SUITABILITY OF THAT MATERIAL BY <br />SAMPLING: TWO SAMPLES SHALL BE TAKEN FROM AREA 1 PRIOR TO INITIATING <br />CONSTRUCTION OF THE EXPANDED WASTE PILE: ONE SAMPLE SHALL BE TAKEN FROM AREA <br />4 AT THE EARLIEST OPPORTUNITY FOLLOWING MOVEMENT OF THE PRESENT WASTE PILE <br />OVERLYING THIS AREA. NOTICE WILL BE GIVEN THE DIVISION WHEN THIS SAMPLING <br />OCCURS: SAMPLES WILL BE TAKEN TO A DEPTH OF B FEET AT ALL THREE LOCATIONS, <br />• COMPOSITED AT TWO FOOT INTERVALS, AND ANALYZED FOR pH, Et, SAR, TEXTURE AND <br />PERCENT ROCK FRAGMENTS. THE RESULTS OF THESE ANALYSES SHALL BE FURNISHED <br />PROMPTLY TO THE DIVISION FOR REVIEW. <br />Stipulation 4 <br />j3 IF, UPON REVIEW OF THE ANALYSES, THE DIVISION CONSIDERS ANY OR ALL OF THESE <br />SAMPLES UNACCEPTABLE FOR USE AS COVER MATERIAL AND SO NOTIFIES WYOh1ING FUEL <br />COMPANY, WYOMING FUEL COMPANY SHALL SUSPEND CONSTRUCTION OF THE EXPANDED WASTE <br />PILE UNTIL THE DIVISION RECEIVES AND APPROVES A WRITTEN COMMITMENT FROM WYOMING <br />FUEL COMPANY TO SUITABLY AMEND OR IMPORT SUCH VOLUMES OF COVER MATERIAL FOR <br />THE WASTE PILE AS ARE SPECIFIED BY THE DIVISION. <br />Stipulation 5 <br />3~ TOPSOIL SHALL BE STRIPPED FROM AREA 1 (WEST) PRIOR TO THE MOVEMENT OF WASTE <br />ACROSS THIS AREA. STRIPPING AND STOCKPILING OF ALL TOPSOIL AND SUBSOIL FROM <br />AREAS 1 (EAST), 2, AND 3 AS IDENTIFIED ON FIGURE 1., THE MAP OF THE PROPOSED <br />COAL PROCESSING WASTE PILE IS REQUIRED PRIOR TO THE PLACEMENT OF WASTE DURING <br />THE SUBSEQUENT CONSTRUCTION OF THE WASTE PILE. A MINIMUM 25' BUFFER ZONE, <br />FROM WHICH TOPSOIL AND SUBSOIL HAVE BEEN REMOVED, SHALL BE MAINTAINED BETWEEN <br />THE COAL PROCESSING WASTE AND THE UNDISTURBED PORTIONS OF THESE AREAS. PRIOR <br />TO STOCKPILING SUBSOIL IN THE LOCATION INDICATED ON FIGURE 1, THE TOPSOIL <br />PRESENTLY EXISTING AT THAT LOCATION SHALL BE TRANSFERRED TO ANOTHER AREA <br />APPROVED BY THE DIVISION. <br />• SRS <br />1659E <br />
The URL can be used to link to this page
Your browser does not support the video tag.