My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109948
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:54 PM
Creation date
11/24/2007 7:10:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
Permit File
Doc Date
1/23/2001
Doc Name
APPLICATION FOR PERMIT GRISENTI FARMS GRAVEL PIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Specific Methods of Operation <br />INITIATION OF OPERATION: <br />At the start of the operation, a specific sequence of events must occur. Some of these events <br />may appear to be occurring contrary to the general phase sequence defined above. This is not <br />actually the case. <br />Before mining can occur the site must be prepared for mining. This will involve a <br />considerable amount of work before any gravel is extracted. The general sequence of initiation <br />events is as follows. The order of these events in this list does not necessarily reflect the precise <br />order they will be done. Of course, some events must follow each other because they are <br />dependent, but others may be completed out of sequence because they are more or less independent. <br />Exhibit C-2A shows this Initiation Process. <br />1. Improvements and/or repair of entrance location. <br />2. Establish permit and operation sign at entrance. <br />3. Construct access road around the southern side of Phase 1. <br />4. Construct the bridge to Phase 2. <br />5. Complete access route to plant site. <br />6. Construct processing plant. <br />7. Begin excavation in the western end of PHASE 2 for the sole purpose of constructing <br />wash water and sediment basin ponds. Gravels removed from these excavations may be processed, <br />but no mining will extend beyond that required to create these facilities. <br />8. Strip the Initial Cut in Phase 1 and stockpile those soils in the designated location - <br />(see Note 1, below). <br />9. Establish conveyor system to connect Phase 1 mining with processing plant (the actual <br />layout of the conveyors may differ somewhat from that shown on Exhibit C-2A). <br />10. Establish dewatering outfall facility. <br />11. Initiate mining. <br />12. Go to the following section on Phase 1 for specifics regarding the mining and <br />reclamation processes in Phase 1. <br />(Items 8 and 11 may be shifted to the Phase I process described in the next section). <br />Grisenti Farms Gravel Pit Original Application Exhibit D Page D-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.