Laserfiche WebLink
• <br />E}CHIBIT B - 2?INING PL;N <br /> <br />ibit C in <br />do;m into <br />4.4 acres initial minesite, ,7 acres haulroad and 4.8 acres~plantsite <br />Phase I of this proposed open pit mine is denoted or. 5r. <br />red, containing approxim;tely 9.9 acres. This area is brok <br />area. <br />Our tests s~row that on Fhase I minesite we will encounte~~ approximately <br />1 Foot of topsoil cover over the minable gravel. This material will be <br />stripped with scrapers and stored in tlie. area (shown on I:xl: bit C) as <br />topsoil storage. IJe anticipate approximately 6000 cu. yards of material <br />to be stored. <br />At this time the exposed gravel will be mined with a bac hoe and <br />hauled on marked haulroad to the crusher, set on the plants to area. <br />There the material will be processed and stockpiled. <br />From the stockpile the processed ^iaterial •.~ill be delive ed to the <br />]obsitc using the attachm_nt to the existing paved P.iver Ro$d. <br />phase II mining will not be undertaken until conversion f 1I~ permit <br />to a regular 112 permit. <br /> <br />