My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109834
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:50 PM
Creation date
11/24/2007 6:58:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987074
IBM Index Class Name
Permit File
Doc Date
4/28/1987
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN <br />1 <br />Grasses <br />SSHIBIT B (Continued) <br />" Crested Wheatgrass (norden) 3.00 <br />I Slender Wheatgrass 8.00 <br />Basin Wildrye 8.00 <br />Blue Grama 3.00 <br />Shrubs <br />Fringed Sage 0.25 <br />4-wing Saltbush 0.25 <br />Big Sagebrush 0.25 <br />Total Lbs. PLS 22.75 <br />I When broadcast, it will be spread on a rough surface and the <br />1 seeded areas will be dragged or raked thoroughly. <br />The three shrub species to be planted are native to the site. <br />If any of they are not available at seeding time a similar species <br />may be added to the mix. The amounts in the mixture are relative <br />low because in the past the Division of Wildlife has informed that <br />shrubs planted in grass mixtures can inhibit the growth of the <br />J grass if planted in too great a quantity. We expect some natural <br />revegetation but to what extent we do not know. <br />No irrigation is planned for the revegetated area. This is a <br />very arid site and no water is available. <br />RSCLAMATION TIMBTABLS. <br />Reclamation will begin in the fall of 1987 in Phase 0~ an area <br />previously mined. We anticipate approximately 508 of the total <br />affected land will be in some form of reclamation by the time <br />mining is completed. It is expected that all recoiling and revegeta- <br />tion will be completed at the end of the second fall after mining <br />is completed in any given Phase. The area will be monitored for <br />success of revegetation until accepted by the Board. If revegetation <br />failures occur prior to release, an analysis will be made and the <br />area will be revegetated again as necessary. The operator estimates <br />that reclamation will be completed by 2005. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.