Laserfiche WebLink
~. <br />The following timetable for reclamation is expected to coincide <br />with on-going mining operations as equipment is available. Final <br />grading and seeding of the existing 110 permitted area must await <br />completion of operations east of the pipeline due to space required for <br />topsoil storage and processing operations. <br />AREA GRADING ~ TOPSOILING SEEDING <br />South 110 Permit <br />~ Area "A" Spring 1987 July, 1987 <br />Areas B, C, ~ D Fall 1987 July, 1988 <br />Areas E ~ F Fall 1988 Late October, 1988 <br />Areas G ~ H Spring 1989 July, 1989 <br />-2- <br />