Laserfiche WebLink
<br /> <br /> <br />-3- <br />a. Cost of material handling and grading to produce irregular <br />shorelines. <br />b. E0.35 per cubic yard is a low estimate for topsoil replacement. <br />Cost of seedbed preparation. <br />U //Cost of seeding. <br />g!/ Cost of trees and shrubs (materials and labor). <br />W Cost of fertilizer and application. <br />Exhibit P ~Ow'ners of Record <br />Provide assurance that the mineral rights for any part of this <br />property are not currently under lease to Amoco Production Company <br />and are legally available far extraction by the Coulson Excavating <br />Co., Inc. <br />Other <br />1. You will also need to submit a Fil~ar}rri~al Warranty and Performance <br />Warranty before a permit can be rued. <br />srs <br />Doc. No. 3730E <br />~~s~ rc~(~u.,u~ co,.~ es~w,,~ <br />