Laserfiche WebLink
- • . <br />Mr. O'Brien <br />Re: Gravel Extraction <br />June 26, 1996 <br />Page 3 <br />Plot plan or map indicating the 1.3 acre mining site along with correct legal description of <br />the site (such as a 200' x 300' disturbed azea with the SE 1/4 of the NE 1/4 of Sectioa 24 <br />etc). <br />• Statement as to volume of material to be mined each yeaz. <br />• Statement as to whether the operation is a wet or dry extraction & processing operation. <br />• Statement as to whether the operation will be temporary for the initial construction of the <br />roads only or whether the operation will be temporary in a cyclical fashion. Meaning, <br />that the roads aze built and then maintained into the future with periodic mining and <br />screening opertions taking place to stockpile the material for future use and mining takes <br />place to replenish the stockpile. <br />Once again, If we can assist you in any way, please do not hesitate to contact Phil Shafer of our <br />staff at 583-6100. <br />Sincerely, <br />Kim B. Headley <br />Director <br />KBH/PS/wb <br />JJim Stevens, Mined Land Reclamation Division <br />Emmet Hance, City-County Health Department <br />Cathy Dolan, Water Quality Control Division <br />