Laserfiche WebLink
<br />Reclawation Plan <br />1. The plant site area will hav 4" of topsoil replaced when it is <br />raclaiwad and the pit sit• will have 6" of topsoil placed on all <br />dry disturbed areas. <br />2. All slopes in areas raclaiwad as dry araas will hav• slopas <br />that do not exceed 3:1. <br />3. We will not change frow the •pprovad seed wixtur• without <br />perwlasion of the MLRB. <br />4. Tha sand wixture used to sand along the roadway will b• <br />subwitted for approval to the MLRB atsff for approval prior to use. <br />S, Tha proposed lake area within the pit is shown on the attached <br />wap. <br />6. Tha ditch shown is sally a depression that has hold surface <br />water frow tiwa to tiwe. Tha ditch or low area will not be <br />required in order to drain the raclaiwad eras. This "ditch" should <br />probably not even bean shown since it really is dust a low area of <br />the old river channel. <br />1. Attached is a revised wap. <br />2. Tha area of the plant sits is essentially a flat piece of <br />ground end when raclaiwad will ba left a flat piece of ground with <br />enough slope to insure local drainage. A topograpic wap of this <br />area would be featureless. Th• topsoil will be plecad on the <br />property after the area is graded to provide slope for drainage. <br />Topsoil will than ba plecad and seeding done. All revenants of the <br />plant would be rewoved. <br />