Laserfiche WebLink
Cost Estimate for Reclamation <br />The Sprague Scraper Service, Inc. Pit is 9.9 acres. The area of excavation will be graded <br />and sloped as it is mined. Topsoil and overburden will be re-applied to the excavations. <br />The small area of trail will be re-seeded by broadcasting native grass seed. The other unit <br />costs were obtained from a local contractor who is equipped to perform reclamation if <br />Sprague Scraper Service, Inc. were to default on the reclamation plan. <br />Volumes/IJnits Unit Cost Item Cost <br />Backfilling Not applicable <br />(to be done as mining occurs) <br />Grading 16 hours Scraper $110/hr. $1760.00 <br />Overburden application 16 hours Scraper $I 10/hr. $1760.00 <br />16 hours Speedy Mover $50/hr. $ 800.00 <br />Working trail 3,000 sq. ft. Lump Sum $ 25.00 <br />Grass Seeding 3,000 sq. ft.(broadcasting) Lump Sum $ 50.00 <br />Building demolition Not applicable <br />Fencing Not applicable <br />Mobilization/demobilization 1 hour <br />(contractors available <br />in Yuma) <br />$100/hr. $ 100.00 <br />TOTAL 4 495.00 <br />