Laserfiche WebLink
EXAIBIT E <br />Reclamation Plan <br />a) Approximately 12 inches of overburden will be replaced after the excavation is <br />complete. <br />b) The maximum gradient of reclaimed slopes will be 3:1. <br />c) Plant growth medium will be salvaged during min and replaced at an average <br />thiclmess of 2 inches. No sample analysis of soils will be conducted. <br />d) No ponds, streams or buildings will remain after reclamation. The previously <br />granted access road will still remain. <br />e) Soil replacement and seeding will be completed once the mining has been <br />completed. Topsoil will be replaced at a depth of at least 6 inches. The following <br />proposed seed mixture will be drilled as per NRCS recommendation: <br />Species Rate (]bs /acre PLS) <br />Timothy 0.5 <br />Orchardgrass 1.0 <br />Green Needlegrass 2.0 <br />Tall Fescue 1.5 <br />Western Wheatgreass 2.5 <br />Alsike Clover 1.0 <br />White Dutch Clover 1.0 <br />Total 9.5 <br />The existing haul road will not be ripped or seeded. <br />