Laserfiche WebLink
U9. Xubslatinn luslallalinn - Minor 12cvisiun #5-17 (amliuucd) <br />• I[ \Vatcr: x211 per load and Iload = h '_11.11(1 <br />I . I'lu ~: ? plugs m $1011 each = x 3111L011 <br />Total = x 49'.(1(1 <br />IV. \4~ire, Guv, Anchor Removal <br />Assumption: <br />A. Removal of wire, guys and anchors to be clone concurrently with pole removal: <br />:gtpro~imately I hour per pole <br />C'ustti: <br />A. 13,40(1 linear feet of wire plus guys and anchors <br />~4 poles thus ~4 hours at $10/hr = $2,700.00 <br />V. 1'ulal Cost:. <br />A. <br />Li. <br />C. <br />D. <br />CJ <br />pence kemoval <br />Cquipment Removal <br />[3orehole Reclamation <br />\Vire, Gov, Anchor Removal <br />subtotal <br />l0% Overhead <br />To[al <br />Say <br />= x 3r,G.00 <br />= x 771.00 <br />= x -192.00 <br />= x2.7oo.00 <br />_ $4,329.00 <br />= x 4,2.90 <br />= x4.76 1.90 <br />_ $4.762.00 <br />• <br />M R 97- I ~4 9(a) 10/2/97 <br />