My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109480
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:02:14 PM
Creation date
11/24/2007 6:20:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
9/29/2005
Section_Exhibit Name
Appendix A Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D9. tiubstaliun Installation - Minor Rcviximt 88-17 <br />• 1. I~cucc Removal - 8' li•ucc <br /> ?(1(I linear feet <br /> X110 linear feet at $1.22 per linear foot A ~(1(Ltlt) <br /> II. Equipment Removal <br /> A. Transformer I: approximate size 9• X S' X 9 <br /> remove from pad and place on trailer <br /> I hr X $202/hr = $2112.00 <br /> 13. Switch gear: approximate size 16~ X 7' X 8' <br /> remove from pad and place un trailer <br /> 2 hr at $202/hr = $4(14.1111 <br /> C. I'ad Removal: approximate size 25' X I S' <br /> outer perimeter - OS' wide and I.5' thick <br /> interior pad - 0.75 thick <br /> outer perimeter ofpad - 80' X 5~ X i.5~ _ ?2 CY' <br /> interior pad - 245' X 14.5' X .7i' = 4.9 C1' <br /> Total = L'.I C5' <br /> Removal Cost $3.70/CY: 12 CY X $3.70/CY = $ a4.ao <br /> D. Pole Removal: 8polesat$IS/pole = $1'0.00 <br />• lll. 13m~chole Reclamation <br /> Assumptions: <br /> A. One I S inch borehole plugged at bottom and within 10 feet ul surface <br /> Q. Additional cement plug placed from upper plug to within 3 feet of surface <br /> C. Plug requires approximately 9 ft3 of cement t~ <br /> ~ <br />Q <br /> D. One sack of cement = , ft3 <br /> E. One sack of cement = $6A0 <br /> P. One sack of cement mixes with 5.2 gallons of water <br /> G. One load of water = 2 1,000 gallons <br /> Costs: <br /> A. Cement 9ft3/3ft3 each sack <br /> 3 sacks required X $6 = $ 18.00 <br /> 6. Equipment: $20/hour and <br /> 2 hours per hole = $ 40.00 <br />. C. Rig: $57/hour and 2 hours per hole = $ 114.00 <br /> D. Water Truck: $50/hour and 2 hours per hole = $ 100.00 <br /> M R 97- 154 9 10/2/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.