Laserfiche WebLink
<br />Aspect <br />Reclamation Operation <br />Quantity <br />Units Unit Cost <br />($) <br />Cost ($) <br />Mining Area 1 <br />F. Bac ailed, graded, and seeded <br /> 1. Seed and mulch 11.5 Ac 675 7,763 <br /> 2. Reseed 20% 2.3 Ac 675 1 553 <br />Miscellaneous Aspects <br />G. Roads and Conve ors <br /> 1. Demolition and removal of <br />Conveyor Bridge <br />1 <br />LS <br />50,000 <br />50,000 <br /> 2. Scarify com acted ground 1 Ac 25 25 <br /> 3. R lace to soil, 6" x 1.0 acres 807 CY 0.85 686 <br /> 4. Seed and mulch 1 Ac 675 675 <br /> 5. Reseed 20% 0.2 Ac 675 135 <br />H. To soil and Overburden Stoc Iles <br /> 1. Material removed for other <br />Aspects 0 <br /> 2. Seed and mulch 3.5 Ac 675 2,363 <br /> 3. Reseed 20% 0.7 Ac 675 473 <br />1 Employee Facilities and Maintenance <br />Station <br /> ]. Scarify com acted ound 0.5 Ac 25 13 <br /> 2. R lace to soil, 6" x 0.5 acres 403 CY 0.85 343 <br /> 3. Seed and mulch 0.5 Ac 675 338 <br /> 4. Reseed 20% 0.1 Ac 675 68 <br />Total Disturbance Costs <br />Contractor Mobilization/Demobilization(8%) <br />Overhead (18.5%) <br />Administration (5%) <br />0.08 <br />0.185 <br />0.05 $394,936 <br />$31,595 <br />$73,063 <br />$19,747 <br />Total Pro osed Financial Warranty $519,341 <br />Disturbed Acreage <br />Financial Warranty per Acre 31.8 <br />$l6 331 <br />wattenberg lakes <br />DMG 7)2 Permit <br />Page 15 <br />