' geotextile separation fabric will be placed between the natural channel area and the <br />roadway fill. This will provide the best opportunity to restore the existing channel when <br />the road area is reclaimed. Being naturally hardened, it is expected that the soils in this <br />area are stable and will not jeopardize the overall stability of the roadway. <br />The drainage structures were designed for the 100 year 24 hour storm based on USFS <br />requirements on their portion of the project. This was also utilized on the MCC property <br />portion of the project. The hydrology/hydraulics design is summarized in Section 6.0 of <br />this report. <br />SECTION 3.0 TOPSOIL STORAGE <br />It is estimated that approximately 6,895 cubic yards of topsoil will be removed to <br />construct this project on both MCC and USFS property. Topsoil will be temporarily <br />stored between stations 124+00 and 130+00 during construction. Approximately 1,790 <br />cubic yards will be utilized after the road is constructed to revegetate the side slopes of <br />the roadway. Approximately 5,105 cubic yards of topsoil will be stockpiled after <br />construction is completed on MCC property at the proposed primary borrow site. The pile <br />will be placed against the existing topsoil pile with slopes no steeper than 2 horizontal to <br />1 vertical. <br />SECTION 4.0 SUBSOIL STORAGE <br />• This project will not create any excess subsoil that is not utilized in the roadway <br />construction. No subsoil stockpiles aze presented in this report. <br />SECTION 5.0 GEOTECHNICAL STUDIES <br />5.1 Field Investigations <br />A drilling field investigation was conducted on the proposed road in March 2003. It was <br />originally proposed that 19 drill holes be placed along the proposed route. However, only <br />13 of the 19 proposed holes were completed as snow and ice conditions prevented the <br />completion of six of the planned holes. The locations of the planned and completed <br />borings are shown on Figures 1 through 6. The 13 soil borings were drilled with a drill rig <br />operated by DA Smi[h Drilling Company under the direction of Pat Peterson of <br />Environmental Strategies Corporation (ESC). The soil borings were advanced using an 8 <br />inch hollow stem auger. Standard Penetration Tests were taken at 5-foot intervals using <br />the appropriate ASTM procedures. All soil samples retrieved during the drilling operation <br />were placed and sealed in plastic bags and shipped to Geotechnical Engineering <br />Incorporated (GEI) for laboratory testing. Several Shelby tubes were pushed into the <br />underlying clay soils to obtain suitable samples for shear and triaxial testing. The drilling <br />• logs for the 13 drill holes can be found in Appendix C of this report. <br />