Laserfiche WebLink
~' <br />-3- <br />4. ,Vildlife <br />A. If the end use is tvildliFe do you plan to contact the <br />Colorado Division of 1Yildlife for their suggestions? <br />5. Reclamation Plan <br />A. When will reclamation start? <br />B. How many acres will be recalimed per year? <br />C. Do not use a hand rake to cover seeds. I recommend that <br />a rake pulled by a tractor or the seed be drilled. <br />D. How do you know that there will be no standing water in <br />the pit and how do you plan to alleviate the problem? <br />E. I recommend the following seed mixture: <br />Streambank wheatgrass - 3 lbs. PLS <br />Western tvheatgrass - 3 lbs. PLS <br />Russian wi.ldrve - 1. 16. PLS <br />Alkalie sacatone - 1 lb. PLS <br />Indian ricegrass - 3 lbs. PLS <br />Alsil;e clover - 3 lbs. PLS <br />Yellow sweet clover - 1 16. PLS <br />Double the amount if broadcast seeded. <br />F. I recommend the following shrubs be planted as seedlings: <br /> <br />Antelou_c bitterbrush <br />Rubber rabbitbruslt <br />Mountain ?±ahogeny <br />Current (These should he planted 5 to a <br />clump and 20 feet apart for moist areas) <br /> <br />Pinon pine <br />Juniper <br />Rubber rabbitbrush (These should be planted 5 plants <br />in a bunch, 20 feet apart for dry <br />areas.) <br />G. I recommend you do not revegetate in .July. <br />h',ain Plant Pit - Pilc No. 77-197 <br />1. Legal llescription <br />A. Legally describe the affected 9.6 acres and trot the 187.7 <br />acres involved in the claims. <br />2. Mining Plan <br />A. Ilow many acres are mined per year? <br />B. How much topsoil (in inches) is removed from the virgin <br />ground? <br />