Laserfiche WebLink
_ _ _ _ - __ _..i.. __ __ _ _ - -.___~ _ _'_ec~~rmwlr'_±~n.a+rw_JMf~~_ <br />~ • • <br />_2_ <br />5. Reclamation Plan <br />A. 17hen will reclamation start? <br />B. IYill you stay 200 feet away from the nowcr line? <br />C. lPhy is only G inches of topsoil replaced? I recommend <br />9 inches of tonsoi.l be replaced. <br />D. How many acres will be reclaimed per year? <br />E. flow do you know that there will be no standing water in <br />the pit and how do you plan to alleviate the problem? <br />F. Hand raking to cover seeds should not be used. I recommend <br />that a tractor null°d rake or the seed drilled be used. <br />G. I recommend the following seed mixture: <br />Streambank wheatgrass - 3 lbs. PLS <br />1Vestern wheatgrass - ? lbs. P1,S <br />Russian wildrye - 1 lb. PLS <br />Alkali sacatone - 1 lb. PLS <br />Indian ricegrass - 3 lbs. 1'LS <br />Alsike clover - 1 16. PLS <br />Yellow sweet clover - 1 16. PLS <br />Double the amount if broadcast seeded. <br /> <br />H. I recommend the following shrubs should be planted seedlings: <br />Antelope bitterbrush <br />Rubber rahbitbrush <br />P7ountain *?ahogeny <br />Current (These should be planted 5 to a <br />clump and 20 feet apart) <br />I. I recommend you do not start revegetation in July. <br />Buena Vista Pit - File ~o. 77-196 <br />1. "?mine Plan <br />A. .Are you working now? <br />B. !That is the depth of the pit? <br />C. Ilow many acres are mined each year? <br />D. In w hat direction is mining proceeding? <br />E. Ilow long will the operation last? <br />F. IVill you affect the railroad found on the east side of the <br /> Dlt? <br />2. `^.an <br />A. Outline in red where the affected land will be? <br />3. Soils <br />A. tYhat .is the death of the Ouray topsoil? <br />