Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description <br />........ I _____~_____~_~______~_......... <br />1 ~ Seel & Plug Drillholes <br />sheet 4 of 4 <br />Cost (f) <br />Subtotal (K): <br />Cost (f) <br />564,090 <br />Subtotal (L ): f64, 090 <br />N. NI SCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />Cost (f) <br />~ Demolition ~ <br />2 ~ Seeding ~ 54,856 <br />Fencing <br />b ~ Mob/Demob ~ f299 <br />Subtotal (M): f5, 155 <br />------------ <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through N): 587,613 <br />____________ <br />II. INDIRECT COSTS <br />________________________________________________________________________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Oescri ption ~ Cost (f) <br />________I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 51,358 <br />2. ~ Contractor's Performance Borxi 0.975% of dir. ~ 5854 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 58,767 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 510,974 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): f98, 587 <br />____________ <br />B. DNG PROJECT ADNINI STRATTON E%PENSES <br />Item No.~ Item Description ~ Cost (f) <br />_._____.I__________________________________________________f ____________ <br />7. ~ Project engineering fees at... 4.25% of cnt r.~ 54,190 <br />2. ~ Staff admin. expense at....... 5.88% of cntr.~ f5,797 <br />NET INDIRECT COST PERCENTAGE: 23.92% Subtotal (B): E9,987 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 520,960 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 5108,575 <br />