Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task <br />_____ No.~ <br />___I________ Task Description <br />______________________________________ ~ Cost <br />____I___.._. (S) <br />..._. <br />Subtotal (H): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />________I_____________________________~___________~____.I....._____ <br />Subtotal (I ): <br />J. EARTHWRK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Tesk Description ~ Lost (S) <br />________I~~_______________________________~________________I____~~______ <br />5 ~ Redistribute Topsoil on Drillpads 8 Access Roads ~ (73,718 <br />Subtotal (J): 513,118 <br />