Laserfiche WebLink
~ • • <br />PROJECT IDENTIFICATION <br />Date ~ 25-Apr-2001 <br />User : SSS <br />Site : H And H Stone Quarry #3 <br />State :Colorado <br />County :San Miguel <br />Permit or job no.: M-2000-154 <br />Abbreviation : none <br />Filename : M154-000 <br />Agency or organization name : DMG <br />Permit or job action ~ New 112c <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. ~ TASK DESCRIPTION USED SIZE HOURS COST <br />Ola -Cut and hll reduction of maximum intedorhighwall ~ dozer 1 11.79 $1,748 <br />02a -Move waste rock from stockpile to frnal placement loader 1 14 46 $865 <br />03a -Move overburden from stockpile to pit loader 1 45.86 $2, 742 <br />04a -Move topsoil from stockpile to pit loader 1 24.02 $1, 436 <br />05a -Spread waste rock dozer 1 1.33 $191 <br />06a -Spread overburden dozer 1 6.3 $917 <br />07a -Spread topsoil dozer 1 2.5 $363 <br />OBa -Revegetate 5 acre area of pit revege 2 32.0 $3,611 <br />09a -Transport equipment to/from site mobilize 4 4.6 $2,328 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 143.00 $14,201 <br />' includes inflation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />NA <br />Liability insurance <br />Performance bond <br />Job superintendent: <br />Profit <br />' not required (or eqp. opera(or serves as super) <br />PROJECTMANAGEMENT- <br />Engineering work and/or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />1.05 <br />NA' <br />10.00 <br />NA <br />5.00 <br />NA' <br />TOTAL DIRECT COST= $14,201 <br />of direct total = $220 <br />of direct total = $149 <br />NA NA total = NA <br />%ofdirect total= $1,420 <br /> TOTAL 0 8 P = $1, 789 <br />CONTRACT AMOUNT (direct ~ O d P) _ $15, 990 <br />NA NA total = NA <br />of cntr. NA total = $800 <br />NA total = NA <br />' conringencres accounted Ior at task level <br />1.55 <br />TOTAL INDIRECT COST = <br />TOTAL BOND AMOUNT (direct + indirect) _ <br />$2,589 <br />