My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109085
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:34 PM
Creation date
11/24/2007 5:48:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/27/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR65
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gggrtcy or organization name :Colorado Division O! Minerals And <br />Permit or other job action :Minor Revision 65 <br />task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 120 <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Ownership co <br />Operating co <br />Ripper op. co <br />Operator co <br />Total unft co 1 fleet wstRiour <br />BCY <br />Utilization % <br />stmour : $56.94 NA <br />st/hour : $104.98 100 <br />stihour : $0.00 0 <br />stmour : $32.53 NA <br />st/hour : $194.45 Tota <br />Swell loose <br />factor : 1.250 volume <br />Source of estimated volume :Division Estima~ <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1,243.2 LCY/hr <br />Material consistency description <br />Cnnsnlidatad srocknile <br />Average push gradient : 5.00 % (i <br />Average site altitude : 7,300 feet <br />Material weight <br />Weight description <br />EarNr - Orv sacked <br />JOB TIME AND COST <br />2,550 Ibs/LCY <br />idion Corredron Fect <br />150 LCY <br />Adjusted unk production : 504.38 LCY/hr <br />Adjusted fleet production : 504.38 LCYRv <br />Fleet size : 1 Dozers) Total job time : 0.30 Hours <br />Unit cost : $0.388 ILCY Total job cost : a58 <br /> <br />to Road <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />
The URL can be used to link to this page
Your browser does not support the video tag.