My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109085
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:34 PM
Creation date
11/24/2007 5:48:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/27/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR65
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :Colorado Division 0/Minerals And <br />Permit or other job action :Minor Revision 65 <br />Task description :Replace Topsoil from Stoc <br />HOURLY EQUIPMENT COST <br />to Dril! Pads <br />Basic machine : Cet D9R - 95U Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. t : ROPS Ceb Shin basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br /> Data souroe : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cosf/hour : $56.94 NA <br />Operating cosUhour: $104.98 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $32.53 NA <br />Total unit cosUhour : $194.45 Total fleet costlttour : $194.45 <br />MATERIAL QUANTITIES <br />InRial Swell Loose <br />volume : 1,800 BCY factor : 1.250 volume : 2,250 LCY <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 1, 243.2 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 % <br />Average site attitude : 7,300 fei <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />EaRh - Orv Decked <br />JOB TIME AND COST <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Vsibility: f.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net wnection : 0.41 <br />Source <br />Adjusted unit production : 504.38 LCY/hr <br />Adjusted fleet production : 504.38 LCYBv <br />Fleet size : 1 Dozers) Total job time : 4.48 Hours <br />Untt cost : $0.388 /LCY Total job wst : $887 <br />
The URL can be used to link to this page
Your browser does not support the video tag.