Laserfiche WebLink
There are no users of surface waters or persons who have water rights in, or adjacent to, <br />the permit azea other than the present landowner. The potential impact to the neazest <br />ground water wells has already been addressed in Section 2.04. OEI will pursue <br />obtaining the necessary priority numbers for the water it develops during the course of <br />mining activities. Adjudication can occur after beneficial use actually occurs. <br />The quantity of water, both surface and underground, will be protected from adverse <br />effects of the mining operation. All surface water originating in and above the drainage <br />area will be allowed to flow to the Animas River as it always has. The Animas Kiver is <br />not over appropriated. <br />Water Monitoring <br />Surface and groundwater will be monitored in the following manner: <br />Surface Water <br />Parameter/Location Spring 1 Spring 3 Spring 4 <br />(C.J. Canvon Ua) 03EA SPG #3) (CJ-LO-SPG #4) <br />flow semi-annual semi-annual semi-annual <br />tem erature semi-annual semi-annual semi-annual <br />H semi-annual semi-annual semi-annual <br />EC semi-annual semi-annual semi-annual <br />full suite chemist semi-annual semi-annual semi-annual <br />Sediment pond dischazges are monitored and sampled in accordance with the <br />requirements of CPDS permit COG 850027. <br />Ground Water <br />Parameter/Location We1117-B We1194-1 Well 95-1 <br />(up¢radient) (mid-mine) (downeradient) <br />depth to water semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />temperature semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />pH semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />EC semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />full suite chemistry semi-annual semi-annual quarterly in '97, <br /> semi-annual after <br />TR08, TRl l (v 1.0) 5-49 Revised 9/97, 8/02 <br />