Laserfiche WebLink
B3tINATINC FOBN - BULLDOZB@ NOBB <br />task is 1 ~ Prep, by: LDO teak File Naae: M03fi <br />............ ......... ..... <br />Date: 03/22/91 Pernit i:N-84-036 Mine: Dakolioe Pit <br />............ ......... ............... <br />Pernit Action: Bond Calculation <br />teak Description: Place O.B. Stockpile in Pit <br />........................................... <br />BOUBLY BQUIPMBNt C09t <br />'-" """ " """"' Basic Machine: Cat D8L <br />Blade type: Universal <br />Attachneot il: BOPB Cah <br />Attachaent i2: 3-ehaak ripper <br />:YHB.. <br />................ <br />................ <br />................ <br />rer: 335 <br />Shift ~sais: 1/day <br />Coat Breakdown: <br />"" " " " " " Utiliaatioe % <br />Ownership coat/hr - 145.45 N/A <br />Operating !overhaul coat/hr- dower = lS3.47 160 <br />-ripper = (2,71 50 <br />Operator coat/hr = 821.06 NIA <br />total egpt. unit coat/hr = =122.68 total fleet <br />NAt6@IAL GDANtItI63 <br />(code hknl <br />r: (122.68 <br />Initial Swell Loose <br />Volune; 15,867.0 BC9 Factor: 1,250 Voluue: 19 833,8 LC9 <br />............ .......... ............ <br />Source of quantity take-off: Pernit Application <br />Source of est. swell factor: Cat Bandbook table <br />BOUBL7 P@ODUCTLON <br />" """""""' Job Condition Correction F ctore <br />Avg. push distance: iS ft. """ "" "" " """"" ""' <br /> " "" " ' Operator.,..,,,,., 0.15 (avg.( <br />Unadjusted hourly Mat. consistency,. : 0.90 (Cat tbl( <br />dower production: 1318 LC7/hr Doaiat nethod..... 1.00 (gen,l <br /> " "" " ' Yieihilit <br />y........ <br />1,00 <br />(ave•) <br />Material consistency: Job efficiency,,,. 0,83 (lah/dayl <br />Conpacted fill or enbanknent traneniaeion tppe. 1.00 ( PS I <br />" "" " "" "" "" """" " "" "' Crade adjustnent., 1.35 (Cat thll <br />Avg. push gradient: 15.00 % (nag( Altitude adj. .,,. 1.00 (Cat tbll <br /> " "" " ' Material weight... 0,90 (Cat tbll <br />Avg, site altitude: 4800 <br />........ ft, <br />. Blade type.,,,.,,, <br />.......................... 1,00 <br />..... 13 or UI <br />Materiel weight 2550.D0 lb/LC7 Net Job Correction 0.68 <br />Mat. Descr,: """" ' """' ""' <br />Barth - Dry packed Adjusted Unit Prod.: 9 7,77 LC9/hr <br /> Adjusted Fleet Production: 9 7,77 LCY/hr <br />JOB COST <br />Fleet sine 1 <br />......... Doser(sl total Job tine: <br />......: 1.15 <br />.... Rours <br />Unit Cost 10.131 <br />......... /LC4 total Job Coat: 12,5 <br />....... 4.70 <br />..... <br />