My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108995
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:28 PM
Creation date
11/24/2007 5:37:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984036
IBM Index Class Name
Permit File
Doc Date
3/22/1991
Doc Name
DAKOLIOS CONSTRUCTION CO DAKOLIOS PIT FN M-84-036 RECLAMATION COST ESTIMATE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. , <br />DAKOLIOS CONSTRUCTION COMPANY <br />DAKOLIOS PIT <br />MLRD File No. M-84-036 <br />Reclamation Cost Estimate <br />March 22, 1991 <br />DIRECT COSTS <br />- Dewater pit - one time <br />Dewater during reclamation construction <br />Overburden - push into Pit <br />Stockpile A - grading <br />Stockpile B - place in pit <br />Stockpile C - place in pit <br />- Pit slopes - grade to 3:1 and 2:1 <br />- Hopper ramp - place in pit <br />- Miscellaneous stockpiles - place in pit <br />- Berm in St. Yrain River - grade <br />- Topsoil pond bank (from topsoil pile no. 1) <br />Topsoil pond bank (from topsoil pile no. 2) <br />Office, plant, equipment, powerline, dewater <br />system, scale, parts, trash removal <br />-- Ripping - plant stockpile area <br />- Discinq <br />- Harrowing <br />- Seed and seeding <br />Fertilizer and application <br />- Mulch and application - <br />~- Crimping <br />Mobilization/Demobilization <br />_t~ <br />~• <br />„~ ~. ~A <br />r„ - n~ o <br />,~n• <br />SUBTOTAL DIRECT COSTS <br />INDIRECT COSTS <br />Overhead and Profit <br />1. Public liability insurance <br />1.55% of direct costs <br />2. Contractors performance bond <br />2,50% of direct costs <br />3. Job superintendent <br />256 hours at 324.89 /h r. <br />4. Contractors pro`~:c <br />lOX ui ;erect :•:3ts <br />Engineering/Bid Specificat;e~:= Con~ract <br />Document preparation <br />2.5% of contract amount <br />(direct costs plus overhead and profit) <br />SUBTOTAL INDIRECT COST <br />TOTAL RECLAMATION BOND <br />LDO/eke/4424F ~eCGG~-. ,... e~ <br />I II~II~~~~I~~~ I~I <br />sss <br />3 11,355.00 <br />3 ,969.28 <br />2,594.70 <br />~ 12,491.26 <br />_ 26,933,.41 <br />34 ,271 .00 <br />- 2,367.28 <br />1,230.00 <br />2,114.30 <br />57.55 <br />7 ,..28.00 <br />25.00 <br />1 ,507,20 <br />936.00 <br />811 .00 <br />2 , 839.00 <br />2,504.00 <br />8,081 ,00 <br />1 ,030.00 <br />1 ,911 ,14 <br />3 124,556.13 <br />E 1,930.62 <br />3,113.90 <br />6,371.84 <br />12 ,FS~.~~ <br />3,713.21 <br />E 27,685.70 <br />3 152,241,83 <br />IS2~ 25~. o~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.