My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108865
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:21 PM
Creation date
11/24/2007 5:25:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
PRE-OCTOBER 1991 HYDROLOGIC MONITORING PROGRAM JUNE 1987-OCTOBER 1991
Section_Exhibit Name
TAB 15 APPENDIX 15-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-October, 1997 Hydrologic Monitoring Program <br />Seneca (I-Y (June, 1987-October, 1991) <br />Monitor in9 frequency by Site <br />Surf eee Water <br />Site Number <br />Discharge <br />Water Quality <br />5W-S2W-FG1 Continuous Monthly/Triannually <br />SW-S2L-FG2 Continuous Monthly/iriannually <br />NPDES 006 Continuous (see NPDES Permit <br />No. CO-0000227 <br />requirements) <br />SN-S2N-SGS Nonthly Nonthly/Triannually <br />SY•52W-SG7 Monthly Monthly/Triannually <br />SY-S2W-SC8 Monthly Monthly/Triannually <br />Continuous = All months (daily) except December-March <br />Monthly = All months except December-March end consisted of field parameters only (pH, <br />temperature, end conductivity) <br />' Triannually meant that water quality samples analyzed according to the surface water long <br />list were collected three times a year at a site, and the activities were timed to toilet[ <br />date representing key hydrologic events such es pre-snowmelt peak, retesaion, and besef low. <br />NOTE: For those surface water monitoring sites located on ephemeral or intermittent <br />channels, monitoring frequencies were complied with providing there was sufficient <br />flow to monitor. <br />SDrinea <br />Site Number <br />Discharge <br />S-1 Semiannual <br />5-S Semiannual <br />S-7 Semiannual <br />5-23 Semiannual <br />5-61 Semiannual <br />5-65 Semiannual <br />Water samples analyzed according to Surface Water Parameter List <br />Semiannual = April-June, September-November <br />Pater Ouelity <br />Semiannual <br />Semiannual <br />Semiannual <br />Semiannual <br />Semiannual <br />Semiannual <br /> <br /> <br />75-2.2 <br />Revised 10/07/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.