Laserfiche WebLink
<br />• <br />• <br />Pre•OCtober. 1991 Hydrologic Monitoring Proorem (June. 1987-OCtober. )991) <br />Peabody operated an 'interim" hydrologic monitoring program from June of 1987 to October <br />of 7991. In October, 7991, Permit Revision Number 1 (PR7) was approved, and upon <br />approval, the Current Hydrologic Monitoring Program as detailed in Appendix 15-3, was <br />initie[ed. Xydrologic monitoring sites are shown on Exhibts 7.1 and 7-5, Tab 7, <br />Hydrologic Description. <br />Information on the program is found on Pages B and 72, Tab 15, Hydrologic Monitoring <br />Program. Monitoring at the sites proceeded according to the frequencies and types of <br />monitoring described in the following pages. <br />15-2.1 Revised 10/07/93 <br />