Laserfiche WebLink
- a~ iiuiiiiiiii iii <br />• • <br />Er~viror~n~er~~., Ir~c. <br />LARRY E. O'BRIAN 7985 VANCE DRIVE, SUITE 205A <br />PRESIDENT ARVADA, COLORAD080003 <br />303-423-7297 <br />March 19, 1993 <br />Mr. Carl Mount <br />Division of Minerals and Geology <br />Minerals Section <br />1313 Sherman St., Suite 215 <br />Denver, CO 80203 <br />Dear Mr. Mount: <br />RE: B&B Excavating, Inc. <br />Montgomery Pit M-86-104 <br />Ditch Relocation <br />RF~E1V~~ <br />MAR 191993 <br />D.~is,on of Mme'a~s ~' Geology <br />Ih ~~ <br />~ ©H~Eet- <br />3 L ~U e a- ~+-a-~„~ <br />P~ u SC-li' <br />ti~ ~~-~.~ .b~ <br />z~~ ~ ~ -Z 1 ~q~ <br />On behalf of our Client B&B Excavating, Inc., we are submit- <br />ting the plans for relocating the CKP Ditch that crosses the above <br />referenced operation. The two maps contain the information <br />necessary to show the relocation plans and other design features. <br />There is also a cover letter addressed to me containing information <br />B&B Excavating has had prepared by Wright Water Engineers, for <br />submittal to the Mined Land Reclamation Board concerning the <br />relocation of the CKP Ditch that crosses this pit. This ditch <br />relocation was planned for and is part of the original permit <br />application approved on October 24th, 1986 and bonded on May 24th, <br />1990. This can be confirmed by reviewing page 9, paragraph 3 of <br />the application book which reads: <br />"Prior to the start of operations on Stage 3, it will be necessary to relocate the <br />CKP Ditch so that it runs along the south side fence line in the 30 foot setback <br />area. It is the mining operator's understanding that the relocatiors project is <br />their responsibility to insure that no harm comes from the relocation. " <br />In addition, the Reclamation Plan Map - Exhibit F shows the <br />proposed new location of the ditch that was approved. By comparing <br />the original Reclamation Plan Map with the Maps submitted you can <br />see we are using the same location along the south property line. <br />When the application was approved the Division addressed this <br />ditch relocation by adding a stipulation to the permit that says: <br />"The operator shall submit to the Division plans for relocation of the CKP <br />ditch. Plans shall be consistent with the requirements of 34-32-11ti(1)(h). The <br />Plans shall be approved by the Mined Land Reclamation Board prior to the <br />excavation of the existing ditch. " <br />