Laserfiche WebLink
• Processed Shale Disposal Area <br />Water Usage (Acre-Feet) <br />Years Acreage Usage (Acre-Feet) <br />5 6 58 <br />6-10 103 575 <br />11-15 217 1,424 <br />16-20 99 650 <br />20-27 482 3,075 <br />TOTAL 907 5,883 <br />• Note: Year 5 in the reclamation sections (Exhibit E) and <br />in the above is approximately equivalent to year 1 <br />in Exhibit D. <br />WATER MANAGEMENT FROM DISTURBED AREAS <br />HYDROLOGIC PROTECTION DURING CONSTRUCTION <br />During the construction of the plant and mine facilities at Colony, <br />every effort will be made to minimize water pollution. To fulfill <br />this commitment, surface runoff from the affected areas will be <br />collected and channeled to sedimentation ponds prior to being <br />discharged from the permit areas. Where possible, all temporary <br />sedimentation ponds will be designed to allow sufficient settlement <br />of suspended solids prior to release of runoff water. <br /> <br />G-34 <br />