My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108788
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:16 PM
Creation date
11/24/2007 5:18:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985210
IBM Index Class Name
Permit File
Doc Date
12/18/1985
Doc Name
LIMITED IMPACT 110 AND SPECIAL 10 DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />EXHIBIT F - Proof of Compliance with Local Government Zoning <br />In accordance with 34-32-115(4)(e), the Board must make a finding that t e operation <br />will be in compliance with local zoning or subdivision regulations. You are not <br />required to submit this information, but a submission would assist the D vision's <br />processing of the application. When the Division notifies the local gov rnment of the <br />existence of this application, it will request information regarding com liance with <br />applicable local law. It is intended that operators may concurrently c e into <br />compliance with local requirements at the same time the Division is proc ssing this <br />application. Information regarding the status with local government wit be helpful. <br />EXHIBIT G -Source of Legal Right-to-Enter <br />This could be a copy of the lease, deed, abstract of title, <br />acceptable alternative would be a statement acknowledged by <br />operator has the legal right to enter the mine. <br />EXHIBIT H -Reclamation Costs <br />or current t x receipt. An <br />a Notary Pub is that the <br />For a 110 permit, if the operator requests financial warranty to be less <br />the operator must submit facts to support such a request. Otherwise, a <br />warranty of $5,000.00 will automatically be set. For all 111 permits, t <br />warranty shall be $2,500.00 per acre. <br />EXHIBIT I - Terms of Governmental Contracts (111 Applications only) <br />than $5,000.00, <br />financial <br />e financial <br />Far Special 10-Day (111) permits, the operator must submit a copy of the contract or <br />other proof that proves the necessity of a Special 10-day permit. The o erator must <br />also submit evidence of the financial warranty provided under the govern ental contract, <br />if it was required. <br />NOTICE PROCEDURES <br />After the application is considered "filed" (pursuant to Rule 1.1(10) wi <br />Land Reclamation Division, notice procedures outlined in rule 3.2 and/or <br />followed. (Format for such notices will be included in the letter you r~ <br />MLR staff informing you of the Completeness ("filing") of your applicati <br />FINANCIAL WARRANTY <br />Ail applicants must submit a financial warranty in an amount determined <br />prior to permit issuance. The law and regulations allow for several dii <br />financial warranty. You should determine what type of financial warrant <br />use and obtain the appropriate forms from the Mined Land Reclamation Dig <br />application review period to facilitate finalization of an acceptable f' <br />and permit issuance. For 111 applications, financial warranty must be s <br />the application can be considered complete. <br />:h the Mined <br />4.2 must be <br />~ceive from the <br />m.) <br />iy the Board <br />'event types of <br />~ you desire to <br />Sion during the <br />uncial warranty <br />ibmitted before <br />
The URL can be used to link to this page
Your browser does not support the video tag.