Laserfiche WebLink
`: <br />~ OF CO~O~ <br />y 9 <br />` ye. ~"~ ~ p DEPARTMENT OF NATURAL RESOURCES <br />~ ~ ~ ~ .~ Dantl H Getches, Executive Director <br />°~"~ " MINED LAND RECLAMATION DI\ <br />* X876 ; DAVID C. SHELTO N, Director <br />Richartl D Lamm <br />Governor <br />.~ <br />DATE: August 6, 1986 <br />T0: Mr. and Mrs. Ver~~lley <br />FROM: Patricia C. Martinek~Reclamation Specialist <br />RE: File No. M-86-105, Vondy Pit <br />Adequacy Items <br />The following items must be addressed by the applicant in order to satisfy the <br />applicable requirements of C.R.S. 34-32-101 et seq, and the Mineral Rules and <br />Regulations of the Mined Land Reclamation Board. <br />Exhibit A - Legal Description <br />1. Please describe the affected area to the nearest quarter quarter section. <br />Exhibit B - Mining Plan <br />/ 1. Specify the depth to which topsoil will be salvaged for use as a plant <br />,l growth medium in the reclamation process. We recommend salvaging at least 12 <br />N~ inches of material. If you do not reapply the topsoil on a graded area <br />immediately after salvage, then you must specify how you will stockpile and <br />stabilize it with a vegetative cover until use in reclamation. Topsoil <br />stockpiles should be located separate from other stockpiles, out of the way of <br />mine traffic and out of stream channels or drainageways. The location of <br />topsoil stockpiles must be shown on Exhibit C - Map. <br />2. Describe the major components of the mining operation such as: roads <br />,~/ and access routes, pit, shop/maintenance, plant, processing, office and <br />v C underground openings like adits or ventilation facilities. These components <br />must be located on Exhibit C - 44ap. <br />~1. 3. Specify the dimensions of any present significant disturbances to the <br />land surface such as pit excavations, mine benches, impoundments, etc. <br />4. Specify the dimensions of any existing or proposed roads that will be <br />used for the mining operation. Describe any improvements necessary on <br />br~ existing roads and the specifications to be used in the construction of new <br />roads.' New or improved roads must be included as part of the permitted <br />acreage. <br />5. Specify how much water will be used in conjunction with the operation, <br />and the source of this water. <br />~~ <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br /> <br />