My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108716
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:01:12 PM
Creation date
11/24/2007 5:13:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981080
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT D
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />uso. scs <br />SL5~69 19.52) <br />RECORD OF COOPERATOR'S DECISIONS <br />AND PROGRESS IN APPLICATION <br /> <br />COOPERATOR Col O.State Dept, Of Hwy E. <br />ASSISTED DY D, Loukonen <br />DATE 11-80 <br /> PUNNED APPLIED <br />FIELD MONTH ' <br />UND USE AND TREATMENT <br />NUMBER AMOUNT YEAR AMOUNT AND <br /> YEAR <br /> Locations Proposed gravel pit is approximately 4.5 miles E. of Cotopaxi <br /> pn Highway 50. <br /> Commercial-Industrial Iand <br /> Pit'xill be used to provide gravel for the state highxay depaztment. Dis <br /> turbed azeas x111 be reclaimed to nonlrrigated pastureland. <br /> RECLAMATION PLAN <br /> r• <br /> Critical Area Treatments <br />,. <br /> Topsoil StockpillnR - topsoil x111 be stockpiled at the in itlation of th <br /> mining process. The first six to fourteen Snches of soil will be stock <br /> piled separately from the remaining suitable subsoil to be stockpiled. <br /> Stockpiles x111 be graded and sloped to 4~1 grade or less. Stockpiles xil <br /> be firmed and seeded if they x111 not be disturbed and no additional <br /> soil x111 be added to the stockpile for more than a year. Use crested <br /> xheatgrass at 10 pounds per acre, • <br /> Soil Profile Reconstruction - As all gravel is mined from designated <br /> areas xithin the affected area, active reclamation x111 commence. Reclam <br /> ation x111 be carried on concurrently with mining thereafter, using suit- <br /> abie plant groxth material from excavated areas and stockpiles. Soil pro <br /> files x111 be reconstructed Sn the reverse order in xhich soil material <br /> xere removed as overburden. The original topsoil and best suited soil <br /> material x111 not be spread over the reconstructed subsoil until the sub- <br /> soil material has been graded and shaped to the final grade. Slopes and <br /> contours x111 be blended into the existing topography as nearly as posslb <br /> Grade x111 be 4~1 or less. At least.28 S,q~ec.~-eleSta'h1e topsoil mater- <br /> ial'w1T1 then be spread uniformallyc over the subsoil. The soil x111 then <br /> be~chiseled or ripped to a depth of 20 inches to provide adhesion between <br /> thn r.o7] ]nyr,rn and lncrrarf, nn11 xntrr hn]dinp, enpncity. <br />e. <br />
The URL can be used to link to this page
Your browser does not support the video tag.