• established around the loadout during construction. No additional facilities <br />removal will be done. <br />The majority of the costs in this reclamation cost estimate were actual contract <br />costs with overhead and profit included. The engineering cost estimate was <br />added using the 6% of the "contract cost" as used in the CMLRD Reclamation <br />Cost Summary Form. <br />• <br />~J <br />4-94 <br />Revised 11-6-87 <br />