Laserfiche WebLink
<br />• <br />Removal of Facilities <br />Coat for removing concrete to below grade <br />Cost of removing irrigation system <br />Total Cost for Removal of Facilities <br />Reclamation Cost including overhead and profit <br />$ 5,200 <br />18,100 <br />~ 23.300 <br />$218,600 <br />Engineering Costs <br />1. Engineering and bid document prep-fees 4.25X $ 9,300 <br />2. Engineering services contract issuance 1.75X 3.900 <br />TOTAL RECLAMATION COST <br />ContinRencv for Prime Farm Land Restoration <br />TOTAL ADJUSTBD RECLAMATION COST <br />$231,800 <br />45.000 <br />$276,800 <br />. 4-92 (Revised 6-20-88) <br />