Laserfiche WebLink
During the operational life of the loadout, topsoil will be protected <br />against erosion and contamination. Contamination of stockpiles adja- <br />cent to the coal loading structures will be prevented by several <br />control measures. Drainage control measures will ensure against con- <br />tamination through contact with coal fines carried by runoff from the <br />disturbed areas. Airborne contamination will be minimized through the <br />use of enclosed handling facilities and dust suppression at all coal <br />transfer points. In the unlikely event, however, that topsoil should <br />became contaminated or otherwise unfit for future use, imported top- <br />soil will be obtained to replace soil lost during the life of the <br />operation. <br /> <br /> <br />4-84 <br />