Laserfiche WebLink
ENVIRO•TEST LTD. <br />/ Project: Sheridan Enterprises Loma Central Loadout <br />Date: 02/16/81 EMISSION CnLCUL.A'flUNS <br />UPL'ttA'1'IUN; Conveying (8) <br />Production Rate: 75,000 <br />Emission Factor: 0.2 ~ ~{•~~~~'%~~~ <br />Uncontrolled Emission Pate: <br />( 75,000 ) tons/yr.( 0.2 <br />ER = 2000 lbs/ton <br />Control Technology Applied: None <br />Percent Reduction: <br />Controlled Emission Rate: <br />L•:R = ( ) tons/yr.(1- <br />UPL:Itn'1'IUN: Load into Rail Cars (9) <br />Production Rate: 75,000 <br />;~ Emission Factor: 0.02 ~,~.,....r.~i.~., <br />Uncontrolled Emission Rate: <br />( 75,000 ) tons/yr. <br />Elt = 2000 l.l,s/ton <br />Control 'technology Ap[,lied: <br />Percent Reduction: <br />Controlled Emission Rate: <br />tons/yr. (]- <br />0_0 2 <br />lus/ton <br />= 7.5 tons/yr. <br />tons/yr, <br />lhs/ton <br />= 0.01 tuns/yr. <br />tons/yr. <br /> <br />