My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE108314
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE108314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:46 PM
Creation date
11/24/2007 4:37:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
APPENDIX C
Section_Exhibit Name
Coal Transportation - TRANSPORTATION EA Removed by MR108 6/29/04
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BASIS OF CONVEYOR COST ESTIMATES <br />• Introduction <br />The cost estimates for the long and short conveyors were developed by Lively <br />Manufacturing and Equipment Company, a design engineering and construction <br />company from Glen White, West Virginia. The company is experienced in coal <br />handling facilities. <br />The estimate was developed without a final detailed design necessary for a <br />firm bid price. To present the most realistic cost estimate required clari- <br />fication and alterations by Lively, The various correspondences used for <br />the final estimate have been outlined in chronological order. <br />• Request for Proposal - April 24, 1984 (Not included) <br />On April 24, 1984, Colorado Westmoreland Inc. requested that Lively Manu- <br />facturing Equipment Company provide a budgetary cost estimate for construc- <br />tion of the overland conveyor belt and short conveyor belt. They are <br />experienced in design and construction of coal handling facilities. <br />A letter dated April 24, 1984, explained the type of construction requested <br />by CWI. It also included drawings of the proposed routes for both types of <br />conveyor belts and the existing facilities. It generalized the types of <br />conveyors that CWI would need and specifications for crossing different <br />areas. The specifications for road crossings contained a request for under- <br />ground culverts for the Fanner' s Mine Road, Fire Mountai n Canal , and State <br />• Highway 133. It also contained a request for making these crossings with an <br />overhead structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.