Laserfiche WebLink
S IA'I F_GI l'.OLClH4UU Nrr, rl dNl~<NM, Iin vC mnr III III III III IIII'll <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, EKecu true Director <br />MINED LAND RECLAMATION/ ~~~ <br />423 Centennial Building, 1313 Sherman Street Y /~'~ <br />Denver, Colorado 80203 Tel. (303) 839-3567 111 <br />Davld C. Shelton <br />Director <br />.Tune 8, 1981 <br />McCoy Aggregates Inc. <br />Mr. Don Nash <br />P,0. Box 644 <br />McCoy, Colorado 86463 <br />RE: McCoy Aggregates Inc. application <br />Dear Mr. Nash: <br />rz ~; u.re~ <br />I have reee~+red the above cited application for adequacy and have the <br />following questions/comments which should be addressed in detail as <br />soon as possible. <br />Application Form <br />1. Is the total affected land 22 acres or 56 acres? Please note that <br />processing areas, stockpile areas, overburden storage areas (including <br />existing dumps which will be further disturbed as a result of mining), <br />End support facilities related to current mining are considered part <br />of the affected area. Please refer to rule 1,1 (2) for the definition <br />of affected land. <br />2. As the proposed reclamation plan will return the land to range, the <br />proposed future land use should be changed from agriculture to <br />rangeland. <br />Exhibit E - Reclamation Plan <br />1, What will be done with the material larger than 1~ inch currently <br />being stockpiled around the perimeter of the screening sites? <br />,~2: Will the trailers and buildings be removed after mining is completed? <br />` ~' The railroad tracks? <br />~/ 3. The Soil Conservation Service's report stated that topsoil is stock- <br />piled on this site. Please supply us with an estimate of the quanity <br />of topsoil stockpiled and the location of this stockpile. <br />4. All salvaged topsoil should be redistributed on disturbed areas. <br />If there is a limited quanity of topsoil available the more critieal <br />areas to be revegetated should be of first priority. Th~_areas, <br />wherever possible, should be covered with a minimum of 3 inches7of <br />topsoil ~~ ~ <br />5. Please specify that if necessary a weed control program will be <br />implemented at the time of reclamation, <br />