My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107974
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:26 PM
Creation date
11/24/2007 4:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 PHASE II AS-BUILT
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regulations of the Colorado Mined Lend Reclamation Division. The structure is stable, _ <br />evidencing no indications of slope instability. • <br />To the best of my knowledge, based upon my professional expertise, and to the extent <br />possible, Poond 006 - Phase 11 at the Seneca 11-W Mine was constructed in accordance with <br />the prudent state-of-the-ert of earthen embankment construction. Further, the structure <br />was constructed in compliance with the approved design, to the extent possible, as <br />specified in Attachment 13-4 of Peabody Coel Company's approved mine permit. Minor field <br />adjustments in horizontal and vertical alignment were necessary during construction to <br />compensate for unanticipated natural conditions, limit the disturbed area, and construct a <br />structure consistent with the existing end rec leimed topography. <br />To the best of my knowledge and belief, field adjustments made during construction to the <br />structure ere in conformance with the Rules and Regulations in the intent of the approved <br />design plans and specifications (see Exhibit 13-b). <br />DEC 12 lyyl • <br />Date <br />Conclusion <br />Sedimentation Pond 006 - Phase It does meet or exceed the design and performance <br />requirements of the CMLRD's regulations. Peabody will inspeet the pond quarterly to <br />evaluate structural integrity, storage capacity conditions, and remedial work requirements <br />in aceordance with the approved mine permit. Therefore, pursuant to Rule 4.05.6(7), the <br />above is Sedimentation Pond 006 - Phase fI es-built certification report. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.