My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107974
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:26 PM
Creation date
11/24/2007 4:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 PHASE II AS-BUILT
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN ANALYSIS <br />General. Sediment Pond 006 was redesigned to meet or exceed the design and performance <br />requirements of Colorado Mined Land Reclamation Division while utilizing as much of the <br />existing topography as possible. Sediment Pond 006 was designed to adhere to the <br />following specifications: <br />1. Provide storage and treatment for the runoff from the 10-year, 24-hour storm event <br />without experiencing any discharge through the emergency spillway; <br />2. Provide an emergency spillway capable of passing runoff from the 100-year, 24-hour <br />storm event; <br />3. Provide adequate storage for sediment generated as determined from the Revised <br />Universal Soil Loss Equation as shown on Page <br />t <br />Hydrology. The hydrology of the watershed was analyzed utilizing the SEDCAD computer <br />program. SEDCAD is an enhanced PC version of the SEDIMOT !I computer program. Tab 13, <br />Attachment 73-1, Addendum 7 contains a listing and description of the SEDCAD input <br />variables. In performing this analysis, the characteristics of the minesite and <br />reclamation procedures along with on-site sediment control procedures were considered. A <br />complete listing of the SEDCAD inputs and outputs for the 10-year, 25 year and the • <br />100-year design storms ere provided in Attachment 13-4, Addendum 1. <br />TABLE 13-4-1 <br />DESIGN HYDROLOGY AND SEDIMENTOIOGY SUMMARY <br />POND 006 <br />Description 10Y r.-24Hr. 25Yr.-24Hr. 100Yr.-24Hr. <br /> <br />Precipitation Depth 1.6 in. 2.1 in. 2.4 in. <br />Inflow Runoff Volume 17.07 ac-ft 23.98 ac-ft 33.36 ac-ft <br />Pond Volume et Peek Siege 16.40 ec-ft 21.3 ac-ft 22.4 ac-ft <br />Peak Stage 7070.1 7072.6 7073.1 <br />Peak Inflow Rate 45.98 cfs 128.1D cfs 187.50 cis <br />Peak Oischarge Rate 18.72 cfs 98.10 cfs 153-42 cfs <br />2 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.