My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE107974
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE107974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:00:26 PM
Creation date
11/24/2007 4:05:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 PHASE II AS-BUILT
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Storage Caoacitv <br /> The as-built storage capacity of Sediment Pond 006 was also analyzed using the SEDCAD <br /> computer program. Table 13.4-15 is a summary of the designed storage capacity. <br /> TABLE 13-4-15 <br /> As-Built Storage Capacity Summary <br /> Pond 006 <br /> Capacity <br /> Elevation Siege (AC.-Ft.) Descrio[ion <br /> 7050 0 0.00 Bottom of Pond Excavation <br /> 7068.6 18.6 13.9 t00X Sediment Storage, and 24~~ <br /> diameter Drop Inlet Principal Spillway <br /> 7070.1 20.1 16.5 10-yr, 24-hr Peak Siege <br /> 7070.8 20.8 17.7 Crest of Emergency Spillway <br />• <br /> 7073.1 23.1 22.4 100-yr, 24-hr Peak Stage <br /> 7078.8 28.8 N/A Top of Embankment <br /> Soillwavs <br /> Sediment Pond 006 has two separate spillways; a principal and an emergency. Please see . <br /> Exhibit 13.6 for location end design of spillways. The principal spillway consists of a <br /> 24~~ diameter drop inlet corrugated metal pipe (CMP) with trash screen. Maximum elevation <br /> (peak siege) with the passage of the 10-year, 24-hour event will be 7070.1, this leaves <br /> 0.7 feet to the emergency spillway crest. <br /> The emergency spillway consists of riprapped trapezoidal channel. Assuming the principal <br /> spillway pipe was plugged, the trapezoidal channel could safely pass the runoff volume <br /> from the 100-year, 24-hour storm. Peak stage elevation with the passage of the 100-year <br /> storm is 7073.1, this leaves 5.7 feet of freeboard to the top of embankment. Please refer <br /> to Addendum 1 for capacities of both spillways during passage of the 10 and 100-year storm <br /> events. Table 13-4-16 and Addendum 2 presents the design calculations for the principal <br /> and emergency spillway. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.