Case No. 94CW036, Findings of Fact, Conclusions of Law and
<br />Decree of the Court Approving Absolute and Conditional Ground
<br />Water Rights, Plan of Augmentation and for Change of Water Rights,
<br />Application of the City of Black Hawk,
<br />Page 10
<br /> APPROPRIATION
<br />NAME SOURCE AMOUNT DATE CASE NO, LEGAL DESCRIPTION
<br /> ADJUDICATION
<br /> DATE
<br /> Creek, a tributary to
<br /> North Clear Creek,
<br /> and water diverted
<br /> from North Clear
<br /> Creek.
<br />Black Hawk Chase Chase Gulch, a 600 acre-feet 5/29/1992 92CW068 Black Hawk Chase Gulch Reservoirwill be
<br />Gulch Reservoir tributary [o North conditional, with (trial on application located in [he S'/, NW'/. and the N'/: 5 W'/.,
<br /> Clear Creek, and the right to fill and held and decree Section 2, T35, R73 W, 6th P.M., Gilpin
<br /> water diverted Oom refill continuously pending) County, Colorado, with the dam axis to
<br /> North Clear Creek via when in priority. intersect Chase Gulch a[ a point approxi-
<br /> [he Upper North Clear mately 1,600 feet from the West section line
<br /> Creek Pumping and 2,400 feet Oom [he North section line
<br /> Station and Pipeline at of said Section 2. The Upper North Clear
<br /> 7.0 c.f.s. filling rate Creek Pumping Station and Pipeline is
<br /> located on [he South bank of North Clear
<br /> Creek, in [he NE'/. of the SW'/. of Section
<br /> 34, Township 2 South, Range 73 West of
<br /> the 6'" P.M., Gilpin Counry, Colorado, at a
<br /> point approximately 2,500 fee[ Oom the
<br /> West section line and 1,900 feet from the
<br /> South section line of said Section 34.
<br />Hidden Valley Groundwater tributary LS c.fs., August 30, 1995 96CW463 SW'/.ofthe SE'/.ofthe NE'/.ofSection 32,
<br />Groundwater to Clear Creek conditional January 20, 1999 T.3S., R. 72W. of the 6th P.M. at a poim
<br />Diversion Point 800 feet West of [he Eas[ boundary of
<br /> Section 32 and 2,030 feet South of the
<br /> North boundary of Section 32, Clear Creek
<br /> County.
<br />Hidden Valley Surface water from LS c.fs., August 30, 1995 96CW463 SW'/. ofthe SE'/. ofthe NE'L ofSection 32,
<br />Surface Water Clear Creek conditional January 20, 1999 T.3S„ R. 72 W. of the 6th P.M. at a location
<br />Diversion Point 1000 feet West of [he East boundary of
<br /> Section 32 and 2,140 feet South of [he
<br /> North boundary of Section 32, Clear Creek
<br /> County.
<br />Black Hawk Intake G Groundwater tributary 25 g.p.m., absolute April I, 1996 94CW036 S W'/. SE'/. Section 31, T.2 S, R. 72 W., 6'"
<br />Wel! to Four Mile Gulch, a (decreed herein) P.M., Gilpin Counry
<br />Permit No. 055474-F tributary to North
<br /> Clear Creek
<br />Black Hawk North Groundwater tributary 30 g.p.m., absolute April 1, 1996 94-CW-036 S W'/. S W'/., Section 6, T. 3 S, R. 72 W., 6'"
<br />Clear Creek Well to North Clear Creek, 10 g.p.m., (decreed herein) P.M., Gilpin County.
<br />(Well Permit No. a tributary of Clear conditional
<br />51757-F) Creek
<br />As part of the water quality stipulation filed with the Court in this matter on January 31, 2000, set
<br />forth in paragraph 35, below, the Black Hawk-Central City Sanitation District must design, construct
<br />and begin operation by December 31, 2005 of a new wastewater treatment plant (the "New Plant") at
<br />a location located downstream of the District's current plant on North Clear Creek. A well is
<br />necessary to provide potable water service at the New Plant. The well will require augmentation of
<br />
|