Laserfiche WebLink
<br />PAR. I <br />Page if of 19 <br />Permit Number: CO-0032638 <br />B. MONITORING REQUIREMENTS (CONTINUED) <br />c. Discharge point(s) 006 <br />Measurement <br />Effluent Parameter Frequency d/'~ <br />Flow (MGD) Weekly <br />Total Suspended Solids (mg/1) Monthly <br />Total Recoverable Iron (mg/1) Monthly <br />Total Recoverable Manganese (mg/1) Quarterly <br />Total Dissolved Solids (mg/1) Quarterly <br />Oil and Grease (mg/1) f/ Weekly <br />pH (s.u.) Weekly <br />Salinity g/ Quarterly h/ <br />Sample Type e/ <br />Instantaneous <br />or Continuous <br />Grab <br />Grab <br />Grab <br />Grab <br />Visual or Grab <br />Grab <br />Grab <br />* Monitoring shall not be required when the outfall 006 is inaccessible <br />(November 1 to March 15, approximately). The permittee will be required to <br />indicate on, or as an attachment to, the applicable discharge monitoring <br />reports (DMR) the specific dates during which the site is inaccessible due <br />to heavy snow. <br />2. Samoling and Reporting <br />Reporting of the above data shall be on a mon <br />Part I.D.2 for specific requirements. Should <br />or snowmelt occur, the permittee shall submit <br />exemption to be claimed. Said proof shall be <br />attachment to the Discharge Monitoring Report <br />appropriate period. <br />thly basis. Refer to <br />a precipitation event <br />proof in order £or an <br />submitted as an <br />(DMR) for the <br />Sampling for compliance with the monitoring requirements specified <br />above shall be performed at the following locations(s): Outfalls <br />001, 002, 003, 004, 005 aad 006; as shown in Figures 1, 2, and 3. <br />Monitoring by the Division for the purpose of compliance and/or <br />enforcement of the effluent limitations shall be performed as per <br />"Sample Type" specified above. <br />See Part I.C. for Footnotes. <br />Amended ~~ <br />