Laserfiche WebLink
." <br />GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 7 AND 8) <br />1. This 'permit is issued iri reliarice upon the accuracy and completeness of information <br />• . .~" supplied by the applican(and,is conditioned upon construction, installation and operation <br />in accordance with ibis information and with.representations made by the applicant or its - <br />. ' 'agents. - - . ~r- ~ - . -, ~ _: _ - _ _ <br />- . ~ P. ~ This permit is valid only for the equipment and operations specifically identified herein. <br />3. Each and every condition of this permit is a material parthereof and is not severable. Any <br />' challenge to, or appeal of, a condition hereof shall constitute a rejection of the entire permit <br />and upon such occurrence this permit shall be deemed denied ab initio. <br />4. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division {APCD) on grounds set forth in the Colorado Air Quality Conlrot Act and <br />- regulations of the Air Ouality Control Commission (AOCC), including failure to meet any <br />express_term or condition of the permit: _- . <br />5. This permit must be .retained and made available for inspection upon request at the <br />_ -location set forth herein. With respect to a portable source which is moved to a new <br />location, a copy of the revised Air Pollutant Emissions Notice (APEN) {required by law to <br />be submitted to the APCD whenever a portable source is relocated) should be attached to <br />this permit. The permit may be reissued to a new. owner as provided in Section III.B. of <br />AOCC Regulation No. 3 upon transfer o1 ownership. <br />6. Initial approval of an emission permitdoes not provide"final"authority foroperation of this <br />source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of C.R.S. 1973, Section 25-7-114(4)Q) and Section tV.H..of <br />,• ~ AOCC Regulation No. 3. Final approval cannot be granted until construction is completed <br />_. and operation and construction have been verified.by the APCD as conforming in a!1 <br />-.... ` ~. .respects with~the conditions of the initial approval permit. '.. :- .. = <br />_' .7. ,You MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to <br />~. commencement of. the permitted operation or activity. Failure to do so is a violation of. .:: , <br />~. ~ C.RS,'1973, Section 25-7-114(4)(j) and Regulation No. 3., Section IV.H.~., and_ can result in <br />the revocation of the initial approval permit. ~ ~ - <br />- 8. You MUST o_btairi final approval within siz months of the commencement of operation as • ~. . <br />that term is defined by the AOCC. Failure to obtain final approval will result in the - :-... <br />re"vocation of the initial approval permit: - - <br />9. .If the APCD. determines that the. terms and conditions of the initial approval permit have <br />_ been satisfied, the APCD will issue a final approval permit, which does constitute'Yinal" . ~ - <br />authority to operate as discussed in Paragraph 6 above: ~ ~ ~ ..~ - - <br />10. Violation of the terms of a final approval permit or of the provisions of the Colorado Air ~" <br />Oualiry Control Act or the regulations of the AOCC may result in administrative, civil or. <br />A _~ <br />cnminal enforcetent actions under C.R.S. 1973, Sections 25-7-115 (enforcement), 25-7- <br />". .. ;121 (inJunctlons), 25-7-122 (civ11 penalties) and 25-1-114 (criminal penalties). :.: - <br />. ~ ::.. y. .tip '" <br />- _ rJ,-.e... _ L-~ . _ ~ . _ - - . <br />11. Unless specifically stated otherwise, the generaf.and special conditions_eontained in <br />- - this permit have been determined by the APCD to be necessary to assure compliance <br />with the provisions of C.R.S. 1973, 25-7-114(4)(8) and, as such, shall be enforceable <br />• undertheprovisions of C.R.S. 1973, 25-7-115 afteriinal approval of the permithas been <br />- -granted: ' - - - .. :. .. - <br />~ REVISED 7/81 29 <br />