Laserfiche WebLink
<br />. ~ COLORADO DE P.AATH ENT OF HEALTH, Water Quality Control Division <br />Renewal Permit Raciona le - Page 3. Permit No.: COC-850000. <br />II. Permit Changes (continued) <br />Other changes: The boiler place language in Part L. Section C., and Part <br />II. is being revised co reflect the more condensed language currently <br />used in individual permits. Where changes were necessary to reflect the <br />differences between general permit requirements and individual permit <br />requirements, such changes have also been made. <br />No ocher significant changes are being made co this general permit. <br />III. Reporting <br />There have been occasions where specific permictees have not properly <br />followed the Noncompliance Notification Requirements specified in Part <br />II.A.J. of the permit. Where a request for relief from total suspended <br />solids and coral iron and/or settleable solids limitations is desired, <br />the permittee must also submit the documentation specified under Part <br />I.B.l.d) - Burden of Proof Requirements. Failure co do so may result in <br />enforcement action and/or revocation of authorization to discharge under <br />the general permit. <br />IV. Whoie Effluent Toxicity (WET) Testing <br />Section L.9.7(2)(a)(i)(A) of [he Regulations For the State Discharge <br />Permit System 6.1.0 (SCCR 1002-2) exempts facilities certified under this <br />general permit from WET costing requirements. <br />V. Antidegradacion <br />The discharges certified under this permit are not reviewable waters <br />pursuant to section 3.1.8(3)(a) of the Basic Standards and Methodologies <br />for Surface Waters 3.1.0 (SCCR 1002-2). <br />Jon C. Kub is <br />January 16, 1992 <br />VI. Public Notice Comments <br />Verbal Comments were received by EPA Region VIII. Their primary concern <br />related co the compliance date for construction and/or re Laced <br />activities. The draft permit stated that this dace was three years after <br />the effective dace of the permit. It was the Division's intention to <br />state that attainment of ope ra tioral level would occur as soon as <br />possible, but in no event lacer than three years after the permit becomes <br />effective. The final permit will clarify this to indicate that the <br />Division •aill permit reasonable timetables for construction with <br />appropriate completion dates; but, the laces[ dace acceptable for <br />completion will be June 30, 1995. A long construction schedule will be <br />approved only if major construction is required. The Division will <br />ensure ChaC no construction schedule is excessively long. <br />